LOCH NESS PROJECT PEQUOD

ROSETTA Project
Sediment Core Sampler


Back to Tools of the Trade

The ROSETTA Project sediment core sampler. Loch Ness, 1994

In 1994 our ROSETTA Project drilled 6m long ‘time capsule’ sediment cores from the bed of Loch Ness.

The acronym ROSETTA stands for:
Recovery Of Sediments Enabling Translation To Acoustics and was designed to complement a Loughborugh University seismic design study named REBECCA.

Our challenge was to design a machine capable of driving a core sampling tube at least 6m into the flat sediments in the centre of the 200m northern basin of Loch Ness.

Two drum-like suction anchors were lowered to the loch bed. Water was then pumped out, drawing them into the sediment and providing a firm base. Above the machine a one-ton salvage lift bag, was inflated underwater, forcing the core barrel downwards past a piston by steel wires acting through pulley blocks mounted on the ‘trunnion’ towards the base of the machine and also within the barrel. The trunnion swivelled to allow the long core barrel to be brought to the horizontal for towing to station and retrieval. Compressed air was injected into the suction anchors to bring the apparatus to the surface. Two cores successfully penetrated to the 10,000 year old late glacial sediments in 1994 assisted by the SWATCH Loch Ness Submarine.


core home

Skipper John Minshull tows ROSETTA home with Ecos. Adrian and Maralyn Shine steady the drums and the precious 6m core

Back to Tools of the Trade


©A and M SHINE

craft

'Ecos' the main Loch Ness Project boat with a small dayboat anfd the Loch Ness Submarine.

cores in bed

ROSETTA embedded in the loch bottom at 200m.